June 25th- July 4th

DSCN0010.JPG (1641638 bytes)

I moved the trailer to prevent a fire.  There was tons of scrap building up underneath

DSC_0088.JPG (2525161 bytes)

The ceiling panels are installed and the roof vent was cut in. I installed the range hood by pre-drilling a 2" hole for the vent.. 

DSC_0073.JPG (2672233 bytes)

Plumbing Projects.  PVC Elbows and 4ways as I start running the cold water lines

DSC_0098.JPG (2502612 bytes)

Interior with The Windows Installed

 

Next Page

Trailer home page

Kasperwing.com Home page