October- November

 

DSC_0011.JPG (2983857 bytes)

 

DSC_0002.JPG (220288 bytes)

Final mounting Position

DSC_0004.JPG (215382 bytes)

Lots of small detail work going on.  The toilet will mount sideways. It looks odd but it is more comfortable this way. The bathroom floor needs to be boxed in now.

 

November 18th- Ordered the LP heater

Ordered the LCD Display for the sleeper

Received the last shipment of aluminum panels (qty 4 @ 4x8 x  .040)

DSC_0007.JPG (1688793 bytes)

Front Profile is now complete. The bottom panel is white but is covered in the shrink wrap

Next Page

Kasperwing Home

Trailer Build Home

Lets look at Pictures of Kasperwings