Trailer Inspection Preparation

 

DMV has sent me my transport permit for the inspection.  My inspection date for the Tiny Travel Trailer is June 26th @ 10:30 am. 

permit.jpg (97684 bytes)

 

rivit101.jpg (55551 bytes)

Front Contour edge molding being riveted into place.

edge-trim.jpg (95695 bytes)

L molding was notched every 1" on one side only to form the trim section to the trailer contour.

profile.jpg (60830 bytes)

front-profile.jpg (54003 bytes)

new-tires.jpg (106756 bytes)

New 26.3" trailer tires rated for 1760lb a side

Next Page

Kasperwing Home Page

Trailer Home