September 11th trailer work

_DSC0031.JPG (1054139 bytes)

_DSC0001.JPG (1216584 bytes)

Exterior Trim sections are being installed

_DSC0004.JPG (1059036 bytes)

Systems monitor is installed

_DSC0006.JPG (974515 bytes)

The portage for the AC Exhaust.  Cool air travels up the inside of the wall and out the vent at the top.

DSCN0030.JPG (304694 bytes)

Back 5" of siding was installed and bent around the corner.   This section is secured with Liquid Nails and screws.

Next Page

Teardrop trailer homepage

Kasperwing.com home page